Marina Park Newport Beach – Public works project for the City of Newport Beach with KPRS Construction as the General Contractor. The construction duration was 12 months and consisted of two large interconnected buildings, a Light House with public restrooms and an interconnecting slide from the second level to the outdoor play ground and a fourth public restroom building. Infinity was contracted to design assist & engineer the build’s exterior metal stud framing, interior metal stud framing, drywall installation, and exterior lath & plaster. The lower levels of the main two building utlized hand carved plaster with a 20/30 sand float finish above. The outlying Light House and Bathroons consisted of metal stud and wood framing with a Smooth Santa Barabra Finish.